INR 0.8 Million per 10 Kg is the Cost of NOT Doing Design Optimization – How?

Trade-off, to my opinion, is the major reason of optimization driven design. Trade-off among performance, time to market, regulatory requirements and all this at a right COST. However, while calculating…

Continue ReadingINR 0.8 Million per 10 Kg is the Cost of NOT Doing Design Optimization – How?