As an Engineering R&D Head, What Else Can You Do to Slash the Product Development Time Further? May be SDD will Help Here

Thanks to the advancement and accuracy of the FEA and virtual validation technologies, 48+ months new vehicle development programs are gone for good. However, with increasing geo-techno-polito-economic pressures even 36+…

Continue ReadingAs an Engineering R&D Head, What Else Can You Do to Slash the Product Development Time Further? May be SDD will Help Here

INR 0.8 Million per 10 Kg is the Cost of NOT Doing Design Optimization – How?

Trade-off, to my opinion, is the major reason of optimization driven design. Trade-off among performance, time to market, regulatory requirements and all this at a right COST. However, while calculating…

Continue ReadingINR 0.8 Million per 10 Kg is the Cost of NOT Doing Design Optimization – How?

Worst Case Method Assembly Tolerance Stack up Calculation for Non-Symmetric Dimensional Tolerances with Example

If you are wondering what is stack-up analysis/calculation, the answer is determining worst case scenario. Moreover, the problem can sorted out in early stages of design rather than undergoing prototyping…

Continue ReadingWorst Case Method Assembly Tolerance Stack up Calculation for Non-Symmetric Dimensional Tolerances with Example